V2 Rocket History
  • Home
  • Blog
  • Galleries
    • Anatomy of the V2
      • The 18 pot injection head
    • Missile guidance
    • Steering and trim
    • V2 Turbopump
      • Turbopump
      • Turbopump 3D CAD
      • Turbopump: original drawings
    • Thrust chamber
    • Valves
    • Fuel injector inserts
    • Peenemünde
      • Development works
      • Karlshagen
      • Werk Süd (South works) region
      • Enigmas
  • All video posts
  • Contact
News Ticker
  • [ June 11, 2024 ] V2 Rocket Photos Decoded: Episodes 1 & 2 V2 missile combat history
  • [ April 20, 2018 ] How a gyroscope guides a rocket Rocket stuff for education and fun
  • [ June 17, 2025 ] The V2 rocket’s secret afterbuner A4-V2 missile technology
  • [ June 16, 2024 ] The riddle of the V2 rocket shape A4-V2 missile technology
  • [ June 15, 2024 ] Dissecting a V2 rocket steam pot A4-V2 missile technology

Development works

Unknown repair workshop (IW) mechanism
IW and F1 on 19th August 1943
RAF reconnaissance photo from 21/08/1944 of F1 region
V2 fin relic near F1
Storage vessel within F1 boundary
V2 missile debris field SE of F1
V2 missile debris near F1
Wooden Carboy frame
Wooden carboy frame examined
Collecting GPS data near F1
1944 bomb crater near R&MH
1944 bomb near R&MH  - 2nd view
Ruins of  materials storage station No 9 next to F1
V2 aerodynamic fin relics
Still frame from F1 video
Another screen grab from F1 video
East German army shooting range near F1 and admin area
Cut post with door hanger
Bomb damaged F1 factory 1945
Peenemünde:  Werk Sud attacked by US bombers August 1944
Werk Sud (South Works)

Categories: Mystery part, Peenemünde-Usedom-locations, Production plant (Versuchsserienwerk), V2 Missile relics

Albums: The Enigmas, Peenemünde research: Werk Süd (South works) region, F1: Fertigungshalle Eins

Tags: #Werk Sud (South Works) #Fertigungshalle Eins (F1) #IW Repair & Maintenance Hall (R&MH) #HAP #HVP #Peenemünde #V2 Missile relics #Usedom #Steam generator

  • Previous
  • Next
Unknown repair workshop (IW) mechanism
V2 Rocket History
category:Mystery part
album:The Enigmas
Unknown repair workshop (IW) mechanism
IW and F1 on 19th August 1943
RAF reconnaissance photo from 21/08/1944 of F1 region
V2 fin relic near F1
Storage vessel within F1 boundary
V2 missile debris field SE of F1
V2 missile debris near F1
Wooden Carboy frame
Wooden carboy frame examined
Collecting GPS data near F1
1944 bomb crater near R&MH
1944 bomb near R&MH  - 2nd view
Ruins of  materials storage station No 9 next to F1
V2 aerodynamic fin relics
Still frame from F1 video
Another screen grab from F1 video
East German army shooting range near F1 and admin area
Cut post with door hanger
Bomb damaged F1 factory 1945
Peenemünde:  Werk Sud attacked by US bombers August 1944
Close Full
Description

We think this relic, welded to a heavy gauge H beam, may be a points switch for a railway line. But do you know what it is, and what it did? If you do, please tell us.

More
#Werk Sud (South Works)
Location
Keyboard Shortcuts Dismiss
  • SSlideshow
  • MMaximize
  •  Previous
  •  Next
  • escClose
	
© Terms of Use

Categories

Sign up for our newsletter

Recent Posts

  • The V2 rocket’s secret afterbuner
    June 17, 2025 0
  • The riddle of the V2 rocket shape
    June 16, 2024 0
  • Dissecting a V2 rocket steam pot
    June 15, 2024 0
  • The ghost of the V2 in the Rocketdyne A-7
    June 15, 2024 0
  • Building the V2 rocket engine
    June 15, 2024 0
  • A72 rocket launch switch
    A4 / V2 Rocket in detail: A72 launch switch
    June 15, 2024 0
  • Big Ben 22
    V2 Rocket Photos Decoded: Episodes 1 & 2
    June 11, 2024 0
  • A4 V2 missile turbopump and Walter steam drive
    A4 / V2 Rocket in detail: Turbopump
    July 5, 2019 0
  • 3D CAD modelling the V2 rocket turbopump
    April 6, 2019 0
  • This month’s question
    March 30, 2019 6
  • Anatomy of the V2 missile
    March 26, 2019 0
  • V2 rocket brass fuel injection inserts
    Testing V2 rocket fuel injectors
    March 20, 2019 0
  • A close-up look at the V2 rocket engine’s fuel injector inserts
    March 11, 2019 0
  • This month’s question for you
    February 28, 2019 3
  • Aerodynamic fin parts with bearing and top-of-fin counterbalance weight visible on the right
    Peenemünde: F1 the giant V2 missile factory at Werk Süd
    May 11, 2018 Comments Off on Peenemünde: F1 the giant V2 missile factory at Werk Süd
This month’s question

Can you help us identify the object below?

Mystery object
This part has a helicoid or screw shape, it seems that it might have been designed to screw into a pipe of some kind. But do you know what it is, and what it did? If you do, click on it and tell us.
Don’t miss a thing – sign up for the newsletter
Privacy policy: We collect e-mail addresses of subscribers to our Newsletter so we can send e-mails from V2rockethistory.com. We use the e-mail addresses only to distribute our electronic newsletter and other information relevant to our website and for no other purpose.

V2rockethistory.com does not sell, rent, or lend e-mail addresses of our users to anyone - ever.

Copyright: V2 Rocket History