This small prefabricated concrete enclosure only has 800mm of wall section remaining. It is situated on the south side of the rail line and about 70m from the West end of the F1/Admin railway platform south of the factory (see map belew). Its function is not known to us but it may have housed electrical relay equipment.
Be the first to comment